University of California, Berkeley California

Genetics & Plant Biology Teaching
Conversion of existing pneumatic controls of the laboratory constant volume HVAC systems with a variable-volume Direct Digital Controls as part of the campus Energy Savings Program.

Tolman Hall
Replacement of Building Central Heating Systems consisting of steam-to-water heat exchangers, VFD pumps, hot water systems for space heating and domestic use.


Life Science Addition and Valley Life Science Building
Feasibility Study of replacement of existing chilled water and cooling tower systems serving the two buildings.
Haas Pavilion Athletic Department
New Laundry Systems with super commercial size washing machines and steam dryer units.


UC Berkeley Gardner Stack/Doe Library
Chiller, Chilled-Water/Cooling Tower Pump Replacement, and Refrigeration Room Ventilation Upgrade.